Truckee, California

West River St. Streetscape Improvement Project

Lumos is working with the Town of Truckee on the West River Streetscape project; part of a revitalization of West River Street (between Bridge Street and Riverside Drive/Mill Street). This project includes sidewalks, curbs, gutters, crosswalks, ADA accessibility, landscaping, lighting, utility undergrounding, and storm drain and parking improvements.

The West River St. Streetscape Improvement Project included conceptual design alternatives, a Phase 1 report, site survey, drainage analysis, and a final design. Our team and the Town facilitated several public meetings, to provide a platform for local residents and community members.

Design for this project was completed in 2022. Lumos prepared construction bid documents and technical specifications and assisted with the bidding and bid evaluation of the project. The project is currently under construction and Lumos is providing engineering support during construction as needed.

Rendering by project architect, Callander Associates.

Our Offices

Boise, ID

8727 West Ardene Street
Suite 102
Boise, ID 83709

Carson City Office

308 North Curry Street
Suite 200
Carson City, NV 89703

Carson City Materials Laboratory

2144 College Parkway
Suite 110
Carson City, Nevada 89706

El Dorado Hills

3840 El Dorado Hills Boulevard
Suite 301
El Dorado Hills, CA 95762

Fallon Office & Lab

275 West Williams Avenue
Fallon, Nevada 89406

Lake Tahoe

312 Dorla Court, PO Box 890
Suite 202
Zephyr Cove, NV 89448

Reno Office & Lab

950 Sandhill Road
Suite 100
Reno, NV 89521

Roseville

3200 Douglas Boulevard
Suite 320
Roseville, CA 95661